
Munchmuseet
Høyden has been participating in the project with the new Munch museum, MUNCH, since 2015.
During the construction period, we fire-painted the steel in the building, installed windows and facade panels and delivered an internal rail system in the ceilings so that all glass can be cleaned with rope access.
Høyden delivered a feasibility study for how MUNCH could be maintained exclusively with work in ropes as a method in 2015.
The study was included in the tender documents for the construction project and set the tone for the solutions that were eventually designed for the building.
See video below for our vision for MUNCH.